Define the complete panel schedule.

Industrial distributionUtility facilitiesLarge buildings

Key information for configuration review

  • Single-line diagram and panel schedule
  • Rated voltage, busbar current, short-circuit level
  • Protection philosophy and relay brand
  • Control voltage
Technical overview

Start with the
right specification.

Use this selection reference to prepare your project brief.

Reference values are not a model datasheet. Availability, standards and test coverage require confirmation for the offered equipment.

Download project sheets ↓
Selection reference +
Rated voltage12, 24, 36 kV
Busbar current630 to 3,150 A
Short-time withstand20 to 31.5 kA 3 s
Panel typesMetal-clad withdrawable (e.g. KYN28 type at 12 kV), air-insulated fixed; incomer, feeder, bus-coupler, metering, capacitor
Loss of service continuityLSC2B (metal-clad) where specified
Internal arcIAC AFLR where specified
Testing topics to confirm +

Confirm the applicable requirements, available reports and agreed test scope with the proposed manufacturer.

Routine testsDielectric test, main circuit resistance, mechanical operation, wiring and functional tests
Type tests (per design)Full IEC 62271-200 type test series including internal arc where specified
Project document package +
  • Model-specific datasheet and approved drawings
  • Applicable test reports and their coverage
  • Inspection, packing and delivery requirements
Manufacturing & quality →
Request a quotation

Send us your
requirement.

Ratings, quantities and destination are enough to start. Attach nothing here: we reply by email and ask for drawings or the tender schedule when needed.

Or email sales@trafovia.com. We reply within one working day (Beijing time).

We use your details only to answer this enquiry. See our privacy policy.

Project resources

Bring your next project
into focus.

Explore the equipment guide and prepare your requirements with our fillable project sheets.