A stronger project
starts with the brief.
Bring together the technical duty, site requirements and delivery scope.
Download fillable project sheets ↗Prepare the essentials.
Use the worksheet for your equipment family. Save a local copy with the supporting project documents.
Select the equipment
Product family, electrical ratings, configuration and quantity.
Add the project context
BOQ, single-line diagram, installation environment and destination.
Set the requirements
Mandatory standards, document scope, delivery date and commercial basis.
Trafovia
Yunnan Maodian Intelligent Co., Ltd.
云南锚点智能有限公司
Kunming, Yunnan, China
Email us
sales@trafovia.com
We reply within one working day (Beijing time). Send the tender schedule, BOQ or single-line diagram as attachments.
What happens next
We check the specification line by line and send back any questions. We then prepare an offer that names the proposed model, the standard, guaranteed losses where relevant, the type-test reports that cover the design and the delivery basis. Drawings and datasheets follow for approval before production.
Start with the product family: transformers, substations, switchgear or cables and conductors.
Bring your next project
into focus.
Explore the equipment guide and prepare your requirements with our fillable project sheets.